Abstract

This paper addresses machines and automated guided vehicles (AGVs) simultaneous scheduling with alternative machines in a multi-machine flexible manufacturing system (FMS) to produce the best optimal sequences for the minimization of makespan (MKSN). This problem is highly complex to solve because it involves the selection of machines for job operations (jb-ons), the sequencing of jb-ons on the machines, the assignment of AGVs, and associated trips such as AGVs’ deadheaded trip and loaded trip times to jb-ons. This paper offers a nonlinear mixed integer programming (MIP) formulation for modeling the problem and the symbiotic organisms search algorithm (SOSA) for solving the problem. For verification, a manufacturing company’s industrial problem is employed. The results show that SOSA outperforms the existing methods and the Jaya algorithm, and using alternate machines for the operations can reduce the MKSN.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call