Abstract

A literature review was conducted to identify a number of schedule improvement tools and to determine their benefits, success factors, and implementation barriers. Selection was based on finding tools that lead to the reduction of project delivery time without increasing project overall cost. Concurrent engineering (CE) was identified as a schedule reduction tool (SRT) that met the selection criteria. This study documented successful applications of CE, verified its potential for schedule reduction, and determined its success factors and implementation barriers. The data collected suggested that implementation of CE has the potential of reducing project delivery time by up to 25%, compared with historical data. Success factors, implementation barriers, and lessons learned were found to be related to management, employee, and process issues. These issues were further ranked according to their apparent significance and impact on successful implementation. Such ranking could assist present and future users in obtaining the maximum benefits from their CE efforts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.