Abstract
Cellular manufacturing (CM) has been recognized as an innovative practice for companies to regain competitive advantages under today's small-to-medium lot manufacturing environment. Among the necessary decisions for a successful CM implementation, cell formation (CF) and group layout (GL) are the two most popular ones. These decisions have received extensive attention but are often treated as separate or sequential processes, despite their cross impact on each other. In this paper, we propose a new approach to concurrently solve the CF and GL problems. A conceptual framework and mathematical model, which integrates these two decisions and incorporates some important factors, such as operation sequence, part demand, transfer batch, machine capacity, and layout type, are proposed. A hierarchical genetic algorithm (HGA) is developed to solve the integrated cell design problem. The results from our investigations show that: (1) the proposed HGA procedure performs better than two other heuristics, and (2) the concurrent approach often finds better solutions than the sequential one.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.