Abstract
Kali warkapi bridge km 49+250 Manokwari, West papua which connects several districts in West papua province stretches 80m based because the bridge previously decreased until it is no longer feasible to use, the type of steel frame bridge structure, then in this final project the design for the replacement of kali warkapi bridge using prestressed concrete structure type at this initial stage the analysis of exsisting conditions, planning of upper and lower bridge structures and calculations is carried out. Superstructure planning takes into account the loads that may occur, namely self-load, additional dead load, traffic load, wind load and earthquake load. In planning the bridge is calculated using Ms.Excel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.