Abstract

Concession period is decisive in public–private partnership (PPP) projects, particularly for complex projects. A systematic approach incorporating real option analysis (ROA) is proposed to optimise the concession under uncertainty. Options are explored to manage uncertainty in the long concession of PPP projects and an optimisation principle is proposed for the concession optimisation. Sensitivity analysis and case comparison are suggested to test the validity of the optimised concession. Applicability of the approach is tested with a PPP utility tunnel case, in which options to expand and recoup are investigated. Important findings include: (1) interests of participants are balanced through the optimisation, the investment value of the project is increased; (2) profit-sharing mechanism is identified as the most important factor, and a prudent design of it can effectively manage uncertainty; (3) option to recoup can optimise the concession period without harming private developer's interest. This research's novelty lies in (a) exploring the management flexibility and identifying potential options in the concession period of PPP projects; (b) a hybrid approach with the integration of ROA and Sobal-based global sensitivity analysis is proposed to perform the concession optimisation; (c) the profit-risk allocation between participants in PPP projects is balanced under the optimisation principle.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.