Abstract

CFETR (China Fusion Engineering Test Reactor) is new generation of Tokomak device beyond EAST in China. An overview of hot cell layout design for CFETR has been proposed by ASIPP&USTC. Hot Cell, as major auxiliary facility, not only plays a pivotal role in supporting maintenance to meet the requirements of high duty time 0.3–0.5 but also supports installation and decommissioning.Almost all of the Tokomak devices are lateral handling internal components like ITER and JET, but CFETR maintain the blanket module from 4 vertical ports, which is quite a big challenge for the hot cell layout design. The activated in-vessel components and several diagnosis instruments will be repaired and refurbished in the Hot Cell Facility, so the appropriate layout is very important to the Hot Cell Facility to ensure the high duty time, it is divided into different parts equipped with a variety of RH equipment and diagnosis devices based on the functional requirements. The layout of the Hot Cell Facility should make maintenance process more efficient and reliable, and easy to service and rescue when a sudden events taking place, that is the capital importance issue considered in design.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call