Abstract

The design and operational planning of an offshore installation must consider environmental challenges along with additional difficulties that arise due to remoteness. Among the major operational issues, logistics support during routine operations and emergencies is critical. The logistics support from an onshore base to a remote and harsh environment offshore production facility is not sufficiently reliable and quick. In this study, the concept of an intermediate offshore resource centre (ORC) as a potential solution to the logistics problem is presented. The purpose, functional requirements and the conceptual design of an ORC with an illustrative example are discussed. A modular volume-limited ship design concept is adopted here to determine the principal particulars of the ORC in the concept design phase. The required functional elements of the ORC are identified, and then the physical space required for each element is represented graphically as a scaled block with the required volume. The principal dimensions are determined after arranging these functional blocks within a ship-shaped envelope. Finally, the concept design of the vessel system is tested and validated with an analysis of the vessel stability and mooring requirements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.