Abstract
As the ITER is being constructed, there is a growing anticipation for an earlier realization of fusion energy. A major design philosophy for the initiated conceptual design study for a steady-state Korean fusion demonstration reactor (K-DEMO) is engineering feasibility. A two-staged development plan is envisaged. K-DEMO is designed not only to demonstrate a net electricity generation and a self-sustained tritium cycle, but also to be used, in its initial stage, as a component test facility. Then, in its second stage, a major upgrade is carried out by replacing in-vessel components in order to show a net electricity generation on the order of 500MWe. After a thorough 0-D system analysis, the major radius and minor radius are chosen to be 6.8m and 2.1m, respectively. In order to minimize wave deflection, a top-launch high frequency (>200GHz) electron cyclotron current drive (ECCD) system will be the key system for the current profile control. For matching the high frequency ECCD, a high toroidal field (TF) is required and can be achieved by using high current density Nb3Sn superconducting conductor. The peak magnetic field reaches to 16T with the magnetic field at the plasma center above 7T. Key features of the K-DEMO magnet system include the use of two TF coil winding packs, each of a different conductor design, to reduce the construction cost and save the space for the magnet structure material.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.