Abstract

The basic definition and development strategy of the DEMO plant based on the Chinese fusion power plant (FPP) program are presented briefly. A conceptual design study of fusion HCSB-DEMO reactor with a fusion power of 2550 MW and a neutron wall loading of 2.3 MW/m 2 is performed recently. Three sets parameters of core plasma for different DEMO design objectives are proposed. A helium-cooled blanket system with ceramic breeder (Li 4SiO 4), the structure material of low-activation ferritic steel (LAF/M) and Be neutron multiplier based on Chinese ITER HCSB-TBM design foundation are considered. The design parameters, preliminary analyses and the basic structure as well as development strategy of HCSB-DEMO reactor are introduced.