Abstract
Conceptual design of a tritium breeding blanket for CREST-1 was conducted. CREST-1 (Compact REversed Shear Tokamak), a conceptual design of water-cooled commercial reactor based on a reversed shear high beta equilibrium, has been proposed as a possible scenario to an economical and feasible reactor succeeding the ITER project. In the present design study, a possibility of cost competitive fusion power plants with water-cooled concept, which has much experience in nuclear power plants, was examined. The new blanket design is based on the low activation ferritic steel components and an advanced super-heated steam cycle, which is used to realize a high thermal efficiency. High value of the thermal efficiency is very effective for reduction of the cost of electricity. On designing the blanket, allowable temperature range of the structure material, low activation ferritic steel is assumed to be 350–900 K with an expectation of the material research and development. Mixture of lithium oxide pebbles and beryllium pebbles is installed in the breeding zone for high tritium breeding ratio and high thermal conductivity of the breeding zone. Mixture ratio of beryllium and lithium-6 enrichment were optimized from viewpoints of temperature distribution in the breeding zone, achievable tritium breeding ratio and its reduction due to burn up. The designed blanket system has approximately 1.4 of local tritium breeding ratio with a 1.0 mm thickness of zirconium plate which is placed at 24 cm from the plasma surface as a conducting shell for kink stabilization. Arrangements of cooling channels and breeding zones and flow rate and inlet temperature of the coolant were also optimized to keep the temperatures of structure materials, breeding materials and coolant in the allowable range. The first wall is cooled by pressurized water at about 570 K. The coolant out of cooling channels of the first wall is lead to those of breeding zone and starts partially boiling. The steam is super-heated up to 750 K in the blanket. This high temperature raises the thermal efficiency of turbine to 41%. Our cost assessment has shown that CREST-1 generates about 1.16 GWe electric power within a competitive COE range.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.