Abstract

Abstract As potential offshore oil fields shift from shallow water to deeper ocean, floating production, storage and offloading (FPSO) systems become more attractive than conventional huge fixed type platforms. Recently we have successfully completed conversion works of two FPSO's from old 280,000 DWT VLCC's and they will be towed and installed at Campos Basin, offshore Brazil. During this project elaborate hydrodynamic and structural analyses were performed to ensure proper function as an FPSO and to convince safety during conversion and towing stage. This paper summarizes general arrangement and typical results of the analyses. Introduction As potential offshore oil fields shift from shallow water to deeper ocean, floating type production platforms such as floating production. storage and offloading (FPSO) systems become more attractive than conventional huge fixed type platforms. The FPSO system is known as economical alternatives to fixed type platforms for deep water applications. Since FPSO has integrated function of production, storage and offloading, its conceptual design is very important to ensure the full performances or these multifunctions. Especially, mooring system has a unique device called turret. Turret enables the FPSO to weathervane with minimum environmental mooring force. A multi-path fluid swivel acts an essential role for oil transfer without leakage during weathervaning. In order to reduce operational cost mooring scheme without thruster-assistance is preferred in spite of quite deep water of around 1,000 meters. Recently Hyundai Heavy Industries has successfully completed conversion works of two FPSO's for Petrobras. Henrique Dias and Jose Bonifacio, from old 280.000 DWT VLCC's and they will be towed and installed at Campos Basin, offshore Brazil. During this project, elaborate Analyses1 were performed to ensure proper function as an FPSO and to convince safety during conversion and towing stage. It covers naval architectural calculations. stability. motion mooring, and fatigue analysis for in-place condition and/or towing condition. Also various global and local structural analyses were performed for floating construction, towing and in-place conditions. During the structural analysis, special attention was paid to consider highly corroded areas arisen from the previous usage as a VLCC. This paper summarizes general arrangement and typical results of the analyses for the Jose Bonifacio. General Arrangement Basically, the hull is converted from 280.000 DWT VLCC that is 17 years old. The general arrangement and principal particulars of FPSO are shown in Figure 1 and Table J respectively. It is claimed that the locations of a flare boom a turret and accommodations are important factors for general arrangement. Generally, the location of accommodation is arranged at stem part as it was for converted hull case. Therefore, the location of the flare boom is at bow which is far from accommodation to prevent the hazardous condition. in spite of forward direction against wind direction. Turret opening may be either at the midship or bow. To ensure the good weathervaning, bow is preferred in our case. However, midship may be chosen in cooperation with thruster-assisted mooring to improve the heave motion characteristics. On the forward part of main deck, a turret and a flare boom are installed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.