Abstract

The main objective of the study is the study and analysis of logistics processes in the activities of construction companies. During the study, methods were used to analyze existing approaches to the management of the logistics system in construction, as well as methods for the effective management of material and technical support. It was revealed that, based on the prevailing conditions, the mission of the logistics center is the introduction of an effective logistics system to ensure construction, which supports the growth of construction volumes by uninterrupted supply of construction materials to Group A. The main goal is to reduce construction time by implementing MRP2 and just-in-time concepts and a cost-effectiveness strategy. It can be concluded that logistics considers the movement of material flows in a company as a single and interconnected process, regardless of which unit controls these flows at the moment. Moreover, logistics technology involves close interaction with other departments at various stages of work with external contractors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.