Abstract

This paper presents the Dynamic Merge Metering (DMM) control strategy to integrate the Dynamic Late Merge control with a merge meter at the downstream taper area of a work zone. In this method, vehicles arriving at a work zone will be instructed in the advance areas of the work zone to stay in their lanes till they reach the beginning of the lane closure. Here the vehicles wait for a green signal like any signalized intersection. The delay penalty is distributed equally in both lanes. A simulation-based method is used with VISSIM to evaluate the performance of DMM.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.