Abstract
To solve the problem of load transmission into thin walled CFRP Structures, a new joining technology is being developed (Multi Layer Insert – MLI). It consists of multiple thin metal foils to distribute load optimally into every single CFRP layer. The placement process for the metal layers is integrated into an Automated Fiber Placement system. In this paper, a process sequence of MLI placement is presented containing the following steps: stockpiling of metal layers, separation, handling, positioning, lay up and fixation of metal layers during fiber placement. Moreover, the monitoring and control concept is discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.