Abstract

Energy consumption is one of the major concerns when planning large-scale high energy accelerator projects such as the future circular collider (FCC) and similar accelerators. To address this problem, we will describe the concept and simulations of a 1.4 MW, 800 MHz two-stage multibeam klystron (TS MBK) having a high efficiency (~80%) and compact design.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.