Abstract

The static Gantt-chart accommodates planned dates for preventative maintenance, or eventually planned maintenance. This is converted to a dynamic Gantt-chart to deal with situations involving on-line analysis for real-time maintenance signatures providing predictive functions, in addition to breakdown situations. This is in addition to the planned preventative maintenance. Thus, the work presents a proposed software design for a complete maintenance scheduling and management system. The system considers the integration of maintenance and the other manufacturing activities. Meanwhile, the related interfaces are also defined. The output of the system is a daily maintenance work plan, listed on a display for the maintenance team, so they can perform the required every day maintenance operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.