Abstract
The static Gantt-chart accommodates planned dates for preventative maintenance, or eventually planned maintenance. This is converted to a dynamic Gantt-chart to deal with situations involving on-line analysis for real-time maintenance signatures providing predictive functions, in addition to breakdown situations. This is in addition to the planned preventative maintenance. Thus, the work presents a proposed software design for a complete maintenance scheduling and management system. The system considers the integration of maintenance and the other manufacturing activities. Meanwhile, the related interfaces are also defined. The output of the system is a daily maintenance work plan, listed on a display for the maintenance team, so they can perform the required every day maintenance operations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Computer Applications in Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.