Abstract

In the construction of stadium management network, advanced computer technology occupies a major position. Computer network provides the possibility of network construction for stadium management. This article aims to study the application of computer technology in the network construction and practice of management equipment in gymnasiums. This article uses the method of supplementing points to solve the problem of breakpoints in the system, so as to prompt the user to check the device hardware environment and network environment. The experiment uses computer technology in the construction of management networks, strengthens the relationship between various modules, and transforms tedious and disorderly management work into orderly tasks, thereby changing the carrier form of management. Experimental data shows that due to the platform request test limit, 100 threads are used concurrently in this test, each time increasing by 20, to obtain the delay time data of the device management function. The experimental results show that the system’s service quality can be measured by the system response time, and the needs of users can be met. In this experiment, when the number of concurrent threads is less than 520, 95% will respond within 0.75 s, and the average response time is 0.48 s. Speeding up the construction of the stadium's management network has greatly improved the management of the stadium’s information resources, deepened the management level, and carried out network work in line with the management needs, so that the work of the stadium has a qualitative leap.KeywordsComputer technologyManagement equipment in stadiumsNetwork constructionNetwork environment

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call