Abstract

The work touches on the national security issues of large-panel buildings from the point of view of settlement of the building on the ground. Displacements of the structure in the level of foundation of the building structure cause the secondary distribution of stresses, thus the possibility of structural scratches of internal prefabricated plate elements. The original model FEM of the construction of the large-panel building system Wk-70, which was built for research purposes, allowed the approximation of the phenomenon contained in the title of this work. Awareness of the safety of the construction of buildings implemented in large-panel technology is very important and constitutes a significant overtone, not only structural, but also general social.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.