Abstract

A graphic control system with a graphical user interface has been set up to control and monitor the equipment on the storage ring, the beam transport line and the full energy electron injector system. This control and instrumentation system was used to commission the storage ring and got successful results. The stored beam current exceeded 300 mA with a beam life time of more than 5 hours for the nominal beam current. The status of the control and instrumentation system is presented in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.