Abstract

The details of a software package developed and implemented on a CDC Cyber computer for the overcurrent and distance relay coordination process are presented. Description about the data base system using RIM is also included. These programs are applied to a 115 kV test system with six buses and seven lines. The computer results are compared to the existing manual settings and the successful performance of the programs is verified.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call