Abstract
This paper deals with a scheduling problem on a single machine with an availability constraint. The problem is known to be NP-complete and admits several approximation algorithms. In this paper we study the approximation scheme described in He et al. [Y. He, W. Zhong, H. Gu, Improved algorithms for two single machine scheduling problems, Theoretical Computer Science 363 (2006) 257–265]. We provide the computation of an improved relative error of this heuristic, as well as a proof that this new bound is tight. We also present some computational experiments to test this heuristic on random instances. These experiments include an implementation of the fully-polynomial time approximation scheme given in Kacem and Ridha Mahjoub [I. Kacem, A. Ridha Mahjoub, Fully polynomial time approximation scheme for the weighted flow-time minimization on a single machine with a fixed non-availability interval, Computers and Industrial Engineering 56 (2009) 1708–1712].
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.