Abstract
This paper considers an optimal scheduling problem of maintenance and production for a machine. Firstly, the problem is formulated as a stochastic switched impulsive optimal control problem. However, there exists the stochastic disturbance in this model. Thus, it is difficult to solve the problem by conventional optimisation techniques. To overcome this difficulty, the stochastic switched impulsive optimal control problem is transformed into a deterministic switched impulsive optimal control problem with continuous state inequality constraints. Then, by combining a time-scaling transformation, a second-order smoothing technique and a penalty function method, an improved Newton algorithm is developed for solving this problem. Convergence results indicate that the algorithm is globally convergent with quadratic rate. Finally, two numerical examples are provided to illustrate the effectiveness of the developed algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.