Abstract
In this paper computational results are presented with a very general, yet powerful backtracking procedure for solving the duration minimization and net present value maximization problems in a precedence and resource-constrained network. These networks are generally of the PERT/CPM variety, although it is not required that they be so. Among the advantages cited for our approach are low computer memory (storage) requirements and the ability to obtain improved solutions rapidly (heuristic properties). Since the resource-constrained project scheduling problem subsumes the job shop, flow shop, assembly line balancing, and related scheduling problems, our procedure can be used with little or no modification to solve a wide variety of problem types. Computational experience is reported for both mainframe and personal computer implementations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.