Abstract
The Colorado School of Mines installed a neutron radiography system at the United States Geological Survey TRIGA reactor in 2012. An upgraded beamline could dramatically improve the imaging capabilities of this system. This project performed computational analyses to support the design of a new beamline, with the major goals of minimizing beam divergence and maximizing beam intensity. The new beamline will consist of a square aluminum tube with an 11.43cm (4.5 in) inner side length and 0.635cm (0.25 in) thick walls. It is the same length as the original beam tube (8.53 m) and is composed of 1.22 m (4 ft) and 1.52 m (5ft) flanged sections which bolt together. The bottom 1.22 m of the beamline is a cylindrical aluminum pre-collimator which is 0.635cm (0.25 in) thick, with an inner diameter of 5.08cm (2 in). Based on Monte Carlo model results, when a pre-collimator is present, the use of a neutron absorbing liner on the inside surface of the beam tube has almost no effect on the angular distribution of the neutron current at the collimator exit. The use of a pre-collimator may result in a non-uniform flux profile at the image plane; however, as long as the collimator is at least three times longer than the pre-collimator, the flux distortion is acceptably low.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.