Abstract
Microgrids and, in general, active distribution networks require ultra-short-term prediction, i.e., for sub-second time scales, for specific control decisions. Conventional forecasting methodologies are not effective at such time scales. To address this issue, we propose a non-parametric method for computing ultra short-term prediction intervals (PIs) of the power prosumption of generic electrical-distribution networks. The method groups historical observations into clusters according to the values of influential variables. It is applied either to the original or to the differentiated power-prosumption time series. The clusters are considered statistically representative pools of future realizations of power prosumption (or its derivative). They are used to determine empirical PDFs and, by extracting the quantiles, to deliver PIs for respective arbitrary confidence levels. The models are validated a posteriori by carrying out a performance analysis that uses experimentally observed power-prosumption for different building types, thus allowing the identification of the dominant model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.