Abstract
The problem of paraffin deposits in oil wells during oil production is investigated. A thermal dew-axing method by the use of a heating cable is considered. A mathematical model for computing the heating current and the operation time of the heating cable is given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have