Abstract

Chennai metropolis has been growing rapidly. Need was felt of a metro rail system. Two corridors were planned. Corridor 1, of 23 km starting from Washermanpet to Airport. 14.3 km of this would be underground. Corridor 2, of 22 km starting from Chennai Central Railway station to St. Thomas Mount. 9.7 km of this would be underground. Occupational health centre's role involved selection of miners and assessing their fitness to work under compressed air. Planning and execution of compression and decompression, health monitoring and treatment of compression related illnesses. More than thirty five thousand man hours of work was carried out under compressed air pressure ranged from 1.2 to 1.9 bar absolute. There were only three cases of pain only ( Type I) decompression sickness which were treated with recompression. Vigilant medical supervision, experienced lock operators and reduced working hours under pressure because of inclement environmental conditions viz. high temperature and humidity, has helped achieve this low incident. Tunnelling activity will increase in India as more cities will soon opt for underground metro railway. Indian standard IS 4138 – 1977 ” Safety code for working in compressed air” needs to be updated urgently keeping pace with modern working methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.