Abstract

The Yarlung Zangbo River is rich in water resources, which is of great significance to the comprehensive utilization of water resources. The reasonable development of the hydropower resources of the Yarlung Zangbo River is realized, through the water diversion project and the establishment of the trapezoidal hydropower station. A comprehensive utilization model of hydropower resources optimized by discrete objectives is constructed, based on the discrete multi-objective optimization theory. It combined with the reading of geographic data by GPS and Matlab. The number and orientation of the optimal construction of hydropower stations and the proportion of the water transfer volume of the water diversion project are obtained, combining the cost of hydropower station construction and water diversion project implementation and the benefits brought by hydropower resources.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call