Abstract

The purpose of this study is to build the simulation system which can evaluate bus priority schemes comprehensively. First, authors improved tiss-NET which is micro traffic simulation system, tocorrespond to actually bus run which based on timetable, detailed demand model of bus passenger. Second, autors add function of several bus priority schemes, bus lanes, bus priority signal system and scheme of reduce bus stop time to tiss-NET. Then, using tiss-NET, we analysis that effect of these bus priority schemes and combination ofthese schemes by estimating trip time of bus and passenger.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.