Abstract
This paper presents a comprehensive framework to manage the main risk events of highway construction projects within three stages: (1) identification of potential risks; (2) assessment and prioritisation of identified risks based on fuzzy FMEA; (3) identification of appropriate response. The main criteria analysed for prioritising potential risk events are cost, time and quality which are quantified and combined using fuzzy AHP. A new expert system is suggested for identifying an appropriate risk response strategy for a risk event based on risk factor, control number and risk allocation. The best response action for a risk event is then identified with respect to the same criteria using “scope expected deviation” (SED) index. The proposed methodology is demonstrated for management of risk events in a construction project of Bijar-Zanjan highway in Iran. For the risk event of “increase in tar price”, deviation from the target values of the criteria is analysed for business-as-usual state plus two risk response actions using SED index. The results show that the response action of “changing paving construction technology from asphalt pavement to RCC pavement” can successfully cope with the risk event of “increase in tar price” and have the minimum deviation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.