Abstract
Research Article| August 01, 2010 Comprehensive Foundation Rehabilitation at Bear Creek Dam JOHN E CHARLTON; JOHN E CHARLTON 1Paul C. Rizzo Associates, 101 Westpark Boulevard, Suite B, Columbia, SC 29210 1Corresponding author email: john.charlton@rizzoassoc.com. Search for other works by this author on: GSW Google Scholar CONRAD GINTHER; CONRAD GINTHER 1Paul C. Rizzo Associates, 101 Westpark Boulevard, Suite B, Columbia, SC 29210 Search for other works by this author on: GSW Google Scholar DONALD A BRUCE DONALD A BRUCE 2Geosystems, L.P., P.O. Box 237, Venetia, PA 15367 Search for other works by this author on: GSW Google Scholar Environmental & Engineering Geoscience (2010) 16 (3): 211–227. https://doi.org/10.2113/gseegeosci.16.3.211 Article history first online: 02 Mar 2017 Cite View This Citation Add to Citation Manager Share Icon Share Facebook Twitter LinkedIn MailTo Tools Icon Tools Get Permissions Search Site Citation JOHN E CHARLTON, CONRAD GINTHER, DONALD A BRUCE; Comprehensive Foundation Rehabilitation at Bear Creek Dam. Environmental & Engineering Geoscience 2010;; 16 (3): 211–227. doi: https://doi.org/10.2113/gseegeosci.16.3.211 Download citation file: Ris (Zotero) Refmanager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex toolbar search Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentBy SocietyEnvironmental & Engineering Geoscience Search Advanced Search Abstract The Tennessee Valley Authority (TVA) Bear Creek Dam is a high-hazard potential embankment dam in northwest Alabama that provides water supply, flood control, and recreation benefits. Since its initial filling in 1969, the dam has experienced significant seepage through its karst limestone foundation. After experiencing limited or temporary success at controlling seepage using supplemental grouting programs and downstream seepage collection systems, TVA elected to embark on an extensive rehabilitation effort for the existing dam's deficiencies, as follows: (1) foundation seepage leading to a potential loss of embankment material at the foundation contact and (2) the potential loss of the embankment dam as a result of overtopping during the potential maximum flood (PMF). Paul C. Rizzo Associates, Inc., was hired to design a permanent solution for the dam's deficiencies. Performance of this rehabilitation consists of construction of a downstream roller-compacted concrete reinforcement structure to prevent loss of the dam during PMF overtopping and installation of a composite seepage barrier consisting of a two-line grout curtain with cutoff wall panels at select locations to reduce potentially hazardous foundation seepage. The existing emergency spillway as well as the existing sluiceway tunnel and associated intake structure were preserved as a part of this new construction. This article presents the means and methods employed to effectively treat the karst limestone geology present at the Bear Creek Dam, with emphasis on the evolving nature of the design and construction of the final seepage barrier, whereby continuous, ‘real-time’ evaluation of the geologic conditions encountered during each phase of the foundation treatment process was used to tailor the scope and design of the next step of the rehabilitation. You do not have access to this content, please speak to your institutional administrator if you feel you should have access.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.