Abstract

A novel power generation plant was devised based on the biomass integrated fired combined cycle as the central unit and supercritical CO2 cycle, regenerative organic Rankine cycle, and steam Rankine cycle as the waste heat recovery subsystems. Exergoeconomic and economic criteria were defined to evaluate the feasibility of the system for investment and construction. Thus, net present value, payback period, and sum unit cost of products were considered as the system’s evaluation criteria from the economic viewpoint. The system was firstly analyzed by developing a precise model in the Engineering Equation Solver. Then, optimal conditions were obtained by coupling the outputs of modeling procedure with artificial neural network, multi-objective particle swarm optimization, and the technique for order of preference by similarity to ideal solution (TOPSIS) approaches. It was concluded that the system has an exergy efficiency of 42.7 % with a power generation capacity of 7.768MW, a total cost rate of 34.79 $/GJ, and a total profit and payback period of 23.3 $M and 5.7 years. For the optimization results in the ε-NPV-SUCP scenario, the optimum values of 58.99 %, 30.6 $M, 35.61 $/GJ were obtained for exergy efficiency, NPV, and SUCP, respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.