Abstract

In an oilfield factory, the blocking and jam in Chang 2 reservoir is very serious. In recentyears, according to analysizing different plugging mechanism and optimizing acidizing formula, theoptimal plugging removal technology was formed suitable for the solution for the Chang 2 reservoirof oilfield factory. This plugging removal formula increases the efficiency radius, and increases thedosage of additives to protect the pipe, rod and pump from the precipitation such as Ca2+and Mg2+,which causes new pollution. Reasonable multiple technologies were designed, and low displacementmethod was used in the injection process, aiming at the characteristics of Chang 2 reservoir. Thismethod extends the time of plugging removal fluid staying around the well bore, which can eliminateplugging near well bore area effectively, and improve the permeability. DQ-1 composite pluggingremoval and other kinds of plugging removal methods have been used more than 50 times, and theeffect is remarkable, which made a positive contribution to stable production of the oilfield.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.