Abstract
The paper reviews the main reasons for the failures and complications with further specific recommendations for completing the well to the project depth in Bulla-deniz field. The practicability of the application of water-based drilling muds characterized with the wall-plastering and managed structural-rheological properties instead of the hydrocarbon-based drilling mud to the 2700 m. It is recommended to use hydrocarbon-based drilling mud only in the revelation of production horizon via drilling. Regardless of the drilling mud’s type and properties, the time of the tool remaining stationary while drilling and round trip operations should not exceed 3-5 minutes. In order to avoid the loss of the drilling mud into the formation, the casing of production string in consolidated clay rock is recommended.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.