Abstract

Suppose that n independent tasks are to be scheduled without preemption on an unlimited number of parallel machines of two types: inexpensive slow machines and expensive fast machines. Each task requires a given processing time on a slow machine or a given smaller processing time on a fast machine. We make two different feasibility assumptions: (a) each task has a specified processing interval, the length of which is equal to the processing time on a slow machine; (b) each task has a specified starting time. For either problem type, we wish to find a feasible schedule of minimum total machine cost. It is shown that both problems are NP-hard in the strong sense. These results are complemented by polynomial algorithms for some special cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.