Abstract

The paper concerns complexity studies on the scheduling problem arising in a simple flexible manufacturing system. The system consists of a single machine, one depot (both with unlimited buffers), and one vehicle (automated guided vehicle). The vehicle operates according to the regular metro strategy. This means that it travels in cycles of the constant length, without stops, transporting at most one job at a time between the depot and the machine. The machine executes available jobs in the non-preemptive way. The goal is to minimize the schedule length, i.e., to minimize the number of vehicle cycles necessary to transport and execute all jobs in the system. We prove the strong NP-hardness of this problem and show that any list algorithm has the worst-case performance ratio equal to 2. Moreover, we mention that special cases of the considered problem, with zero transportation times from the depot to the machine and from the machine to the depot, are polynomially solvable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.