Abstract

This study focused on the feasibility of autotrophic nitrogen removal to treat high ammonia leachate, using combined partial Nitritation and Anammox process. In partial nitritation reactor, the optimal operation condition was found with influent ammonium concentration of 1200 mg/L, DO about 3 mg/L, HRT 3 days and temperature about 31°C at the ratio of NO2-N / NH4-N effluent kept at 1.1, which is a prerequisite for the application of Anammox. In Anammox reactor, more than 85% ammonium is removed at HRT 8 days, temperature 28±1°C, and pH 8. The removal rate of nitrogen and COD in combined partial Nitritation and Anammox process are 90% and 74%, respectively. Thus, a combined process of partial nitritation and a subsequent Anammox could be an alternative solution for ammonium removal for leachate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.