Abstract
In this paper, we analyzed the competitiveness of an open-cycle gas turbine (OCGT) in the Korean electricity market and found reasons why OCGT has not been constructed since 2001, when the market opened. Through the analysis, we found that OCGT was weak in the Korean electricity market due to 3 factors: high load factor, high price of liquefied natural gas, and existing inefficient power plants. Using the conformity theory of the optimum in resource planning and the equilibrium in market dynamics, we verified the reasons by implementing resource planning using the Wien Automatic System Planning (WASP)-Ⅳ package with actual market data for the 16 years from 2001 to 2016. In addition, considering the new energy policy of Korea, shifting main sources of electricity generation from nuclear and coal to clean renewable energies and natural gas, we analyzed the competitiveness of OCGT in the future Korean electricity market. We identified the factors unfavorable for OCGT in the current market and suggested what should be changed to cope with high renewable energy penetration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.