Abstract
Construction management at risk, design/build and design/bid/build are three principal project delivery systems used in the United States today. This paper empirically compares cost, schedule, and quality performance of these three project delivery systems, using project-specific data collected from 351 U.S. building projects. The study included collecting, checking, and validating industry data, significance testing of univariate comparisons and the statistical development of multivariate linear regression models for predicting average project performance. A nonresponse study verified statistically that collected data were appropriate for analysis and representative of the industry from which they were drawn. Significance testing and multivariate comparisons used nearly 100 explanatory and interacting variables to explain project cost, schedule, and quality performance. Specific comparisons between project delivery systems, performance metrics, and six facility classes are discussed. Results and the level of confidence that surrounds each finding are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.