Abstract

AbstractErected in 1930, the Matawin Dam caused an inversion of the hydrologic regime of the Matawin River: snow‐melt water in spring (April to June) is stored in the reservoir and then released in winter (January to March) to feed the hydroelectric generating stations built downstream on the Saint‐Maurice River. Thus, heavy floods occur upstream from the dam in spring but downstream in winter. We compared the interannual and interdecadal variability of the heavy flood characteristics (magnitude, duration, frequency and variability) both upstream (spring floods) and downstream (winter floods) from the dam during the 1934–1994 period. This comparison revealed that the principal change observed downstream from the dam translates into a strong increase in the duration (in days) of heavy floods. The average duration of these floods quintupled. This change in duration occurred around the mid‐1960s and thus led to a significant decrease in the magnitude, frequency and variability of heavy floods. It also altered the relationship between the climate indices and these fundamental characteristics (magnitude, frequency and duration). Downstream from the dam, the magnitude and frequency are positively correlated to the Atlantic multidecadal oscillation (AMO), whereas upstream they are negatively correlated to the same index. However, the AMO index is negatively correlated to the duration downstream from the dam, whereas upstream this characteristic is no longer significantly correlated to any climatic index.Two factors have been invoked to explain this change observed downstream from the dam. The cooling observed since the 1960s at the station located at the dam. However, this cooling was not observed on the scale of the entire watershed. This reduces its plausibility. The increase in hydroelectric power production in the watershed after nationalization of hydroelectric power in 1962. This increase would be explained by the expansion of the market for hydroelectric power (national and international markets). Before nationalization, the hydroelectric power produced in the watershed was intended only for regional industries. Copyright © 2010 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.