Abstract

Wastewater drainage systems asset management decisions, in particular regarding rehabilitation interventions, are largely dependent on close-circuit television (CCTV) inspection results. However, the results of CCTV inspections are affected by several sources of uncertainty. Within the present communication, the inspector's uncertainty is quantified by comparing periodic inspection reports from three trunk sewers of a Portuguese sewer system. The inspections were carried out by the same experienced inspector using the same equipment. Therefore, the uncertainties from the lack of experience and the difference of the inspector and equipment were ruled out. The protocol uncertainty is also quantified comparing the results obtained with the Water Research Center (WRc) and the National Research Council of Canada (NRC) protocols condition ratings. Both operational and structural condition rating were analysed, but emphasis was given to the later since it dictates the repair and replacement interventions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.