Abstract

This paper presents a comparative analysis for two alternatives of industrial substation arrangement with selective secondary radial type: first with one main transformer and one reserve and the second one with two main transformers and one reserve. The analysis are based on the power flow calculation, short circuit and reliability indices using the Electrical Power System Analysis Software (ETAP) and on the acquisition costs of equipment and materials. The analysis' methodology application in both alternatives is presented and the results are analyzed and compared as well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.