Abstract

This paper presents the application of gravitational search algorithm (GSA) and particle swarm optimization (PSO)-based approach along with multiple FACTS (flexible AC transmission system) devices for the economic operation of an interconnected power system under different loading condition. Two different types of FACTS devices such as static Var compensator (SVC) and thyristor-controlled series capacitor (TCSC) are used in this paper. The location of the FACTS devices is obtained by the reactive power flow in the transmission lines. The reactive loading of the system have been increased from the base value to 110 and 120% of base reactive loading. Finally, results have been compared between both the techniques in terms of minimization of active power loss and operating cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.