Abstract

The life prediction of equipments guarantees reliable, safe, efficient and continuous operation of thermal power plants. In this paper wall thickness of reheater tubes of boiler number 3 of Neka power plant in north of Iran are measured at several points during maintenance shut down periods. Thickness dependency vs. time has been investigated. Artificial Neural Network (ANN) as a tool has been acquired to determine this dependency. Extrapolation of thickness function vs. time applying maximum normal stress criteria results in corresponding thickness. The maximum wall reduction rates have been calculated by two schemes namely Fuzzy function (FF) and Neural Network (ANN) applying numerical calculation and Genetic Algorithm. Results have been compared with the existing relevant data from the literature and measured data of the plant in order to determine the accuracy and verify the validity of the methods.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.