Abstract
Several lines of reclamation have been tested in the Palamós/Vall-Llobrega (Girona, Spain) wastewater treatment plant. Each line consists of a filtration treatment (infiltration-percolation, sand filter, ring filter and physico-chemical treatment) plus a disinfection system (UV, peracetic acid, chlorine dioxide and ozonation). Every combination has been evaluated and compared with the other possibilities. This combination of filtration and disinfection allows the use of lower doses of disinfectants, thus minimising the negative impacts of the whole process and improving the reliability of the reclamation facilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have