Abstract

Owing to the increasing population in Kirkuk, Iraq and the consequent rise in the production of waste, alongside with global warming caused by an increase in the greenhouse gases concentrations, a high level of emissions was observed at the landfill site near Kirkuk. These emissions can be transmitted by the wind over considerable distances and adversely affect the environment and individual health. In this study, two pilot scale columns were built to investigate different options for achieving sustainability by reducing long-term landfill emissions. Each reactor was packed with (8.5) kg of shredded synthetic solid waste (less than 5 cm) that was prepared according to an average composition of domestic solid waste in the city of Kirkuk. The main result of this study was that the pretreatment of the waste may shorten the transition time for active methane development and increase the methanogenesis of the landfill site and also affects COD removals efficiencies which were 19.11% and 66.53% for columns A and B respectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.