Abstract

In the construction planning process, the calculation of the quantity of each project work was packaged in a Bill of Quantity (BoQ) to complete the project and greatly affected the continuity of the entire construction construction process. With advances in technology in the world of construction, it could simplify planning in built a building and could increased the accuracy of calculations without using assumptions that could increased the volume of work. One of the results of current technological advances was the creation of the Building Information Modeling (BIM) method, a method that was able to simulate all information in a development project into a 3-dimensional model. Currently the use of the BIM method in Indonesia was still limited so that in this research, the aim was to determine the effectiveness of the use of BIM on the accuracy calculation of the volume of the BoQ and to know the percentage comparison. The building project that was used as a comparison was a building with the middle rise building category, namely the Central Jakarta BPJS Building. Based on the research conducted, it was found that the difference between conventional and BIM results on pilecap components was 5%, column 6%, beam 35%, floor slabs 2%, stairs 22%, ceiling 2.26% floor coverings 14% lower than conventional calculations but for the wall component the BIM calculation is 0.78% greater than the conventional calculation. So that the total percentage ratio is 10%, thus this proves that the use of the BIM method in calculating quantity was effective in terms of calculation accuracy.

Highlights

  • With the development of the construction industry requires planners and construction service implementers to improve the quality and effectiveness of the construction process

  • This technology-based concept, namely Building Information Modeling (BIM) [9], where its use can produce buildings with a fast execution process and all the detailed information is contained in one Big Data, it can minimize errors at the construction stage in the Architecture Engineer Construction industry (AEC) of Indonesia [10]

  • The calculation result of the effectiveness using BIM on the accuracy of the Bill of Quantity (BoQ): Pile Cap Validation Figure 13 is the results of the pile cap volume output: 40 30 20 10

Read more

Summary

Introduction

With the development of the construction industry requires planners and construction service implementers to improve the quality and effectiveness of the construction process.

Results
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call