Abstract

In this paper, first transient waves in the gas-insulated substation (GIS) are analyzed and methods for suppression of very fast transients (VFTs) in GISs are introduced. For suppressing VFTs, four methods are presented, including suppression by terminal components, capacitance components, adopting a resistor-fitted disconnector, and ferromagnetic rings. Finally, these approaches are compared with each other. These methods can be divided into two groups. The first group contains the methods (such as terminal components and reconfiguration) that can be used after installation of the GIS and during the operation of the GIS. The second group contains the methods (such as the resistor-fitted disconnector and ferromagnetic rings) that must be used as an extra limitation before installation and during the design of the GIS. Advantages of the first group are simplicity and the low cost of implementation along with producing minimal changes in the installed GIS. The main advantage of the second group is estimation of all factors during the design of the GIS. Finally, the best approach for the suppression of VFTs is chosen based on the criteria of the transient waves and feasibility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.