Abstract

This article compared the two supporting structure programs which were prepared for the foundation pit of Zhengzhou Exhibition Hotel, from the angle of cost, duration, and deformation conditions. The better one was selected for the project. Monitoring results of two important indicators with the security of supporting structure were analyzed, they were deep displacement in supporting structure and displacement of pile top. With the conditions of continuous excavation, this paper also concluded shifty discipline and tendency of the supporting structure, which could provide some references to similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.