Abstract

With more uncertainty and variability existing in smart grid, deterministic load flow, which is used to analyze the operation conditions on a daily routine and planning the power systems for future investment, could not solve the problems with consideration of renewable generation intermittence and load variation. Nowadays, with more attentions are paid to the environment, carbon emission problem is one of the main concerns in smart grid strategies and planning. It is a great opportunity and challenge for planners to take good care of all stakeholders' interests. Multi-objectives need to be considered when making a critical decision. This paper presents result comparisons between probabilistic optimal load flow and probabilistic load flow by considering both carbon emission and minimization of power loss of the entire grid. The framework is applied to the modified IEEE 14-bus system, which is modeled in Power Factory Dig SILENT, with intermittent wind energy source and load variation consideration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.